Providence United Methodist Church

Background

Providence United Methodist Church in south Charlotte was installing a new pipe organ; a new pipe organ with a famous background. The organ was an Aeolian-Skinner, what some people call “the Rolls Royce of organs,” and its previous home was the Kennedy Center in Washington, DC. Hand-in-hand with a very complex organ installation job was the challenging HVAC task of an integration into a 50-year-old system to main-tain extremely consistent temperature and humidity in the sanctuary. Consistent temperature and humidity were a re-quirement so as to not wreak havoc on the organ tuning.

UMC Approach

Having a long-standing relationship with Providence United Methodist Church, United Mechanical Corporation was called in to tackle this delicate job. Because of their engineering background, United Mechanical knew that simultaneous cooling, dehumidifying, and reheating of the supply air would be the key to achieving the very specific temperature and humidity range requirements. Already in place was a 60-ton air handler, chiller, and boiler and United Mechanical wanted to save the Church money and make use of them. Other contractors, however, might well have suggested ordering all new equipment and substantially increased the overall cost of the project. An upgraded controls system turned out to be central to the proposed design. New controls were installed on the air handling unit to replace the old pneumatic ones, and control of the unit was added to their existing Building Automation System. The upgraded controls system was then programmed to maintain the required temperature and humidly range. Demand Control Ventilation was also added to manage the amount of outside air being treated. The United Mechanical in-house staff handled all the design work, engineering drawings, equipment procurement, controls programming, and installation—providing a single source solution for this critical project.

Results

Because United Mechanical was able to handle the entire project in-house, they had control over all aspects of the timing and deliverables. The project took place during the summer months and was completed with minimal disruption to the Church occupants; the facility was not without cooling for one single Sunday. Whereas the old two-pipe HVAC system would require 4-6 hours to switch from heating to cooling, the new one made the transition instantaneous! Also, the Variable Fan Drive installed with the controls upgrade not only ensured proper control of the air handling unit, it also helped the Church reduce their energy usage.

7 Comments

  1. Juan251 April 24, 2026 at 5:33 pm
  2. Louis397 April 25, 2026 at 5:34 am
  3. Matthias1525 April 26, 2026 at 3:35 pm
  4. Jonah2875 May 8, 2026 at 12:03 am
  5. Jim1659 May 16, 2026 at 4:28 am
  6. Brody2438 May 20, 2026 at 10:47 pm
  7. Landon2464 May 24, 2026 at 8:18 am

Leave A Comment

Related Posts